Sanctuary Rooms Build Team 主堂房间建堂招募
Week 2:3: focusedOctober roles19–23. led by Ron; seeSee the live schedule for datesconfirmed helpers and confirmedopen assignments.roles. 第二周由荣强带领,按岗位分工,日期及已确认分工请查看最新排班。第三周:10 月 19–23 日,已确认帮手及空缺岗位请查看排班。
Help Us Build the Sanctuary Rooms
CurrentWEEK plan:3 October· installationOCTOBER schedule19–23, 2026
Building together, one step at a time.
Monday’s focus is the final wall reinforcement with George (耀基), and crewfinishing roster.the Weekstained 2exterior-facing isboards. plannedThe remaining work moves us toward rooms for Tuesday–Friday, October 13–16. Tuesday starts at 5:30 pm; other timesparents and dailysmall-group attendance are being confirmed.gatherings.
Week 2 uses three build helpers alongside Ron: one cutting, one pre-drilling, and one assisting with fastening/installation. About two or three practical-support volunteers may help separately, as needed.
Status: Tuesday,George Wednesdayis andconfirmed Thursdayfor constructionMonday. rolesTwo construction-helper slots remain open on Monday; three each on Tuesday–Friday. Support slots are covered.open Friday’s actual construction and support participants are recorded on the schedule. See the live schedule for daily roles and support assignments.
separately.
Last updated: October 17, 2026.
In Short
Ron leads work on
Ron estimated roughly two more weeks overall, including aboutchoose a weekslot
Week after3 electrical· workhelper finishes. This is a working estimate, not a completion commitment. On Tuesday, Adam and Gabriel help with cutting/pre-drilling, with the split assigned by Ron; Ken Fong (嘉辉) assists Ron with installation. Judy and Janet provide on-site support, and Judy brings a dish. Du Jiakunslots
George is confirmed for cuttingMonday’s onwall Thursday,reinforcement. OctoberConstruction 15.openings: 邓集Monday is2; confirmedTuesday–Friday 3 per day. Practical-support and food offers are welcome separately. Please use the schedule for pre-drillingthe live assignments.
Continue the focused-role model: three construction helpers besides Ron, plus about two or installation on Wednesday, October 14, and Thursday, October 15; Ron assigns his role on each day. He fills one construction position each evening. Adam and Gabriel are also confirmed for Wednesday, October 14, for cutting/pre-drilling; with 邓集, the three-helper crew is covered. Ron assigns the final roles. Enoch Zheng (郑以诺) is confirmed for installation assistance on Thursday, October 15; with Du Jiakun and 邓集, the three construction-helperpractical-support rolespeople areas covered.needed. Ron assigns suitable tasks and the final split. Friday, October 16 — actual participation: Ron led the exterior-board installation. George (耀基) and Adam worked together on reinforcement; Jacob (曲华), Sarah (小滨), Luke and Ken Fong (嘉辉) also came to help. Ericson helped repair the security system. Peggy cleaned the site; Thian-Peng (添平) and Ally swept and collected leaves at the front entrance. Pastor Kaan came in the early afternoon and cooked the crew’s meal; Yi Kiu (二娇) brought a tart. Everyone helped with the final cleanup, leaving the venue ready for Saturday’s Cantonese worship and 5L2F. Only the listed dates are confirmed.
Additional confirmed support and access: Catherine (牛慧) delivers food and provides on-site support on Thursday, October 15; arrival time to confirm. Susan (晓英) provides on-site support with moving materials and cleaning on Wednesday, October 14; arrival time to confirm. Ericson arrives at 10:00 am on Thursday, October 15, to give Sean access for wiring. Thursday’s daytime visit is separate from the evening construction shift; neither support nor building access fills a construction-helper position.
Who We Are Looking For
Role-based construction help:Cutting to Ron’s measurements, pre-drilling, and fastening/installation assistance. Ron measures, directs the work, makes decisions and handles fastening where his experience keepsas the workmoving.changes.RolesGeorgecanfillsflexonebyoftask.Separate practical support:Moving suitable materials, tidying, cleanup and encouragement. These roles do not count toward the three construction positions. Light-duty volunteers must not lift heavy items.Careful on site:Follow Ron’Monday’sinstructionsconstruction-helperand work within your ability. Ron can guide/train suitable helpers; cutting requires his assignment.Voluntary participation and rotation:slots.Everyone is welcome to take part, even when a shift is
covered;covered.tasksEvery workday is voluntary; partial evenings and rotation areassignedwelcome.byPleaseRon.keepTelltimeusfor family, fellowship and rest.
Progress so far
A record of milestones reached, not a completion percentage. Final wall reinforcement and exterior-board installation are still in progress.
Milestones reached
- Room framing assembledThe basic wood frames are in place; final reinforcement remains.
- Stained boards preparedVolunteers prepared the
actualstained/painteddatesboards now being installed. - Further connections reinforcedAdditional brackets and stronger wall connections were added in Week 2.
Underway · Monday focus
- Finalize wall reinforcementGeorge returns Monday, October 19, to finish the structural reinforcement to the wall.
- Finish exterior stained boardsContinue from the board installation already underway, aiming to finish the outside faces.
Still ahead
- Glass windows and doorsInstall the room windows and doors.
- New door openings to the foyerCreate the planned new doorway exits to the foyer.
- Sound insulationInstall sound insulation before closing the walls.
- Drywall and paintHang and finish drywall, then paint.
- Lighting and switchesComplete the lighting and switch installation.
- VentilationInstall ventilation; coordinate power, airflow and the duct route.
- TV and small speakersMount the TV and small speakers for parents and small-group use.
- AV network and wiringComplete the AV/network connections and wiring.
Before closing the walls: Coordinate electrical, AV/network and ventilation routes, then insulation and drywall. Ron confirms the work sequence with the relevant skilled helpers. This is the remaining project scope, not a promise to finish everything in Week 3.
Choose a date. Choose a role.
Contact Thian-Peng (添平) with the date, role and times you can help.help, Noplus onetool experience or lifting restrictions. Construction and practical support are separate. A signup is expectedconfirmed toonly attendwhen everyit evening.appears in
Thethe Commitment
roster.You aredo not need to be confirmed.a Seeprofessional builder, own tools, or have been involved in the livedesign. scheduleTell ratherus thanyour assumingexperience lastso week’ssuitable hours.work
Glass, onelectrical, Octoberventilation 11–12.and Sunday,structural Octoberwork 18,need suitable skilled helpers. Open volunteer slots do not authorize specialist tasks. Ron confirms safe assignments; building access is aarranged restseparately.
About day.2–3 support people as needed; tasks may be combined. Light-duty support is welcome, with no heavy lifting.
No weekend shift is added here. Any weekend work needs separate confirmation around church activities.
Before each work session
- Confirm that date’s attendance, start/finish times and opening/locking arrangements.
- Ron
Fridayconfirmscleanup:suitableEveryonetasks,helpedtoolsclean up on October 16, leavingand thevenue ready for Saturday’day’sCantonesesequence.worshipCoordinate specialist work before closing walls.- Arrange food and
5L2F.practicalRetainsupport only after confirmation. Light-duty helpers must not lift heavy items. - Keep floor protection in place unless a change is agreed.
Saturday:No construction shift is scheduled; any work needs separate coordinationtiming around church activities.
Original Friday arrangements (planned)
Jacob (曲华) and Sarah (小滨) were scheduled for shared cutting/pre-drilling with arrival around 6:00 pm; Ron was to assign the split. Adam, Ken Fong (嘉辉) and George (耀基) were also confirmed as build helpers, with final roles assigned by Ron. Peggy was scheduled for cleanup, with arrival time to confirm. Sinnie was scheduled for light-dutyConfirm cleanup after 8:30 pm, with no heavy lifting.
Youth Scripture-writing Opportunity
Ron agreed in principle to Scripture being written with markers on approved interior framing before it is covered, with photos as a record. Timing and surfaces must be coordinated with Ron. Young people must be supervised in a safe area separate from hazardous work; no activity time is booked yet.
What You Do Not Need
You do not need to be a professional builder or carpenter.You do not need your own tools.You do not need to have been part of the design or feedback process.
How to Sign Up
Choose an open role from the live schedule and contact Thian-Peng with the date, role and times you can help (for example, “Thursday — pre-drilling”). Construction roles are cutting, pre-drilling and installation. Support roles include materials/on-site organization and cleanup, especially Friday’s reset for Saturday activities. Let us know your tool experience or lifting restrictions; Ron confirms suitable assignments and provides guidance. Daily attendance and building access are confirmed separately; the live schedule is the source for confirmed assignments.
Background
For what the rooms are, why we are building them, and what the congregation asked for, see Sanctuary Rooms: What We're Building and What We Need From You.
招募弟兄姊妹参与主堂房间施工
最新安排:十月安装排班及每日帮手名单。第二周计划于第三周 · 2026 年 10 月 1319–23 日至日
同心建造,一步一步往前。
周一重点是由 16 日(周二至周五)施工。周二晚上 5:30 开始;其他时间及每天出席仍在确认中。George(耀基)完成结构与墙面的加固,并完成已刷好外侧木板的安装。接下来的工作,让房间逐步为家长及小组聚会预备好。
第二周按岗位分工:除荣强以外,3 位施工帮手,分别切板、预钻孔及协助固定/安装。另按需要安排约 2–3 位实际支援人员。
状态:周二、周三及周四施工人手已齐。周五实际施工及支援人员已记录在排班中。每天岗位及支援请查看最新排班。
George 已确认周一参与。周一还需 2 位施工帮手;周二至周五每天还需 3 位。实际支援岗位另计,均可报名。
最后更新:2026 年 10 月 17 日。
第三周
· 帮手报名岗位
George 已确认周一完成与墙面的加固。施工空缺:周一 2 位,周二至周五每天 3 位。实际支援及餐食另行报名;最新分工以排班为准。
沿用按岗位配搭的方式:除荣强以外,3 位施工帮手,另按需要安排约 2–3 位实际支援人员。工作推进时,由荣强安排合适分工。George 占周一其中 1 个施工帮手岗位。
即使当晚人手已齐,愿意参与仍然欢迎。每天参与都是自愿的,可参与部分时段,也可轮替;请顾及家庭、团契及休息。
简要说明建设进度一览
荣强带领主堂两间房间的施工。先加强框架及连接,再安装已刷好的外侧木板,并按进度处理门的工作。电工完成后,再进行内侧板材/石膏板、表面处理及油漆。电工时间不由荣强直接掌握。按已达到的里程碑记录,不以百分比估算完工程度。与墙面连接的最后加固及外侧木板安装仍在进行中。
荣强估计整体可能还需约两周,其中电工完成后约需一周收尾。这是估计,不是完工承诺。周二由
已达到的里程碑
- 房间木框架已搭起基本木框架已就位,仍需完成最后加固。
- 外侧木板已刷好弟兄姊妹预备好的木板,已陆续用于安装。
- 已增设连接加固第二周已加装连接件,加强部分结构与墙面的连接。
进行中 和· Gabriel 协助切板/预钻孔,具体分配由荣强安排;Ken Fong(嘉辉)协助荣强安装。Judy 和 Janet 现场支援,Judy 带一道菜。Du Jiakun(杜弟兄)已确认 周一重点
- 完成与墙面的最后加固George(耀基)10 月
1519 日(周四)切板。邓集已确认周一)继续完成结构与墙面的加固。 - 完成外侧木板安装接续已开始的工作,目标是完成已刷好外侧木板的安装。
接下来要完成
- 玻璃窗及门安装房间玻璃窗和门。
- 通往门厅的新门洞开出计划中通往门厅的新门口。
- 隔音材料封墙前放置隔音材料。
- 石膏板及油漆安装石膏板、处理接缝及表面,再上漆。
- 灯具及开关完成照明及开关安装。
- 通风设备安装通风设备,协调电源、气流及风管路线。
- 电视及小音箱为家长及小组使用,安装电视和小音箱。
- 影音网络及布线完成影音、网络连接及相关布线。
封墙前先协调:电线、影音网络及通风路线,再安排隔音材料及石膏板。具体工序由荣强与相关有经验的帮手确认。以上是项目尚余工作,不代表承诺在第三周全部完成。
不需要是专业建造人员,也不需要自备工具或曾参与设计。请说明自己的经验,方便安排合适的工作。
玻璃、电工、通风及结构工作需要合适且有经验的帮手。报名一般施工岗位,不等于可以承担这些工作。由荣强确认安全分工,开门安排另行确认。
按需要合计约 14 日(周三)及 15 日(周四)协助预钻孔或安装,每天由荣强安排具体岗位,每晚计 1 位施工帮手。Adam 和 Gabriel 也已确认 10 月 14 日(周三)切板/预钻孔,与邓集合计 2–3 位施工帮手,人手已齐,具体分工由荣强安排。Enoch Zheng(郑以诺)已确认 10 月 15 日(周四)协助安装,与 Du Jiakun 和邓集合计 3 位施工帮手,人手已齐;合适工作及具体分工由荣强安排。10 月 16 日(周五)实际参与:荣强带队安装外侧木板;George(耀基)和 Adam 配搭加固。Jacob(曲华)、Sarah(小滨)、Luke 和 Ken Fong(嘉辉)也到场帮忙。Ericson 协助修好保安系统。Peggy 清洁现场,添平和 Ally 清扫及收集前门落叶。简牧师下午较早到教会,为施工团队做饭;Yi Kiu(二娇)带来馅饼。大家一起收拾清洁,场地已为周六粤语崇拜及五饼二鱼预备好。只确认所列日期。位,岗位可兼任。欢迎轻量支援,不搬重物。
新增已确认支援及开门安排:Catherine(牛慧)于 10 月 15 日(周四)送餐及现场支援,到场时间待确认。Susan(晓英)于 10 月 14 日(周三)现场支援,包括搬运材料及清洁;到场时间待确认。Ericson 于 10 月 15 日(周四)上午 10:00 到教会,为 Sean 开门布线。周四白天的安排与晚上施工分开;支援及开门不计入施工帮手岗位。此处不新增周末施工;如需做工,须另行确认并协调教会活动。
我们需要什么样的帮手每次开工前
按岗位配搭施工:按荣强量好的尺寸切板、预钻孔、协助固定/安装。荣强量尺寸、指挥、作决定,并在需要时亲自固定提高效率;岗位可随工作调整。逐日确认出席、开始及结束时间,以及开门锁门安排。实际支援另计:搬运合适的材料、整理、清洁及鼓励团队,不计入 3 个施工岗位。由荣强确认合适的工作、工具及当天工序;封墙前协调相关专门工作。- 确认后才安排餐食及实际支援;轻量支援人员不搬重物。
注意现场安全:按荣强指示,在自己能力范围内做工;他可指导和培训合适的帮手,切板须由他安排。地板保护继续保留,除非另有商定;配合教会活动确认清洁时段。自愿参与、轮替休息:即使当晚人手已齐,愿意参与仍然欢迎,具体工作由荣强安排。请告诉我们实际方便的日期和时间,不需要每晚都来。
时间安排
日期:10 月 13 日至 16 日(周二至周五)。周二晚上 5:30 开始;结束时间和其余晚上的时间待确认。请以最新排班为准,不自动沿用上周时段。休息:10 月 11、12 日不施工;10 月 18 日(主日)休息。周五清洁:10 月 16 日大家一起收拾清洁,场地已为周六粤语崇拜及五饼二鱼预备好。地板保护继续保留,除非另有商定。周六:尚未安排施工,如需做工须另行协调教会活动。
周五原定安排(计划)
Jacob(曲华)和 Sarah(小滨)原定共同协助切板/预钻孔,约晚上 6:00 到场,具体分配由荣强安排。Adam、Ken Fong(嘉辉)及 George(耀基)也已确认协助施工,具体分工由荣强安排。Peggy 原定协助清洁,到场时间待确认;Sinnie 原定晚上 8:30 后协助轻量清洁,不搬重物。
年轻人写经文的机会
荣强原则上同意在内侧框架封板前,用记号笔在获准的位置写经文,并拍照留念。时间和位置须与荣强协调。年轻人须有人带领,在与危险施工分开的安全区域进行;活动时间尚未安排。
你不需要具备的
不需要是专业建筑或木工师傅。不需要自备工具。不需要曾参与设计或意见收集。
如何报名
请从最新排班选择空缺岗位,联系添平并说明日期、岗位和方便的时间,例如“周四——预钻孔”。施工岗位包括切板、预钻孔及安装;支援岗位包括材料搬运/现场整理及清洁,特别是周五为周六活动预备的清洁。请说明使用工具的经验或搬运限制,由荣强确认合适分工并指导。逐日出席及开门安排分开确认;已确认分工以最新排班为准。
背景资料
关于这两间房间是什么、为什么要建、以及会众提出了哪些需要,请参阅主堂房间:我们要建什么,需要你回应什么。
招募弟兄姊妹參與主堂房間施工
最新安排:十月安裝排班及每日幫手名單。第二週計劃於第三週 · 2026 年 10 月 1319–23 日至日
同心建造,一步一步往前。
週一重點是由 16 日(週二至週五)施工。週二晚上 5:30 開始;其他時間及每天出席仍在確認中。George(耀基)完成結構與牆面的加固,並完成已刷好外側木板的安裝。接下來的工作,讓房間逐步為家長及小組聚會預備好。
第二週按崗位分工:除榮強以外,3 位施工幫手,分別切板、預鑽孔及協助固定/安裝。另按需要安排約 2–3 位實際支援人員。
狀態:週二、週三及週四施工人手已齊。週五實際施工及支援人員已記錄在排班中。每天崗位及支援請查看最新排班。
George 已確認週一參與。週一還需 2 位施工幫手;週二至週五每天還需 3 位。實際支援崗位另計,均可報名。
最後更新:2026 年 10 月 17 日。
第三週
· 幫手報名崗位
George 已確認週一完成與牆面的加固。施工空缺:週一 2 位,週二至週五每天 3 位。實際支援及餐食另行報名;最新分工以排班為準。
沿用按崗位配搭的方式:除榮強以外,3 位施工幫手,另按需要安排約 2–3 位實際支援人員。工作推進時,由榮強安排合適分工。George 佔週一其中 1 個施工幫手崗位。
即使當晚人手已齊,願意參與仍然歡迎。每天參與都是自願的,可參與部分時段,也可輪替;請顧及家庭、團契及休息。
簡要説明建設進度一覽
榮強帶領主堂兩間房間的施工。先加強框架及連接,再安裝已刷好的外側木板,並按進度處理門的工作。電工完成後,再進行內側板材/石膏板、表面處理及油漆。電工時間不由榮強直接掌握。按已達到的里程碑記錄,不以百分比估算完工程度。與牆面連接的最後加固及外側木板安裝仍在進行中。
榮強估計整體可能還需約兩週,其中電工完成後約需一週收尾。這是估計,不是完工承諾。週二由
已達到的里程碑
- 房間木框架已搭起基本木框架已就位,仍需完成最後加固。
- 外側木板已刷好弟兄姊妹預備好的木板,已陸續用於安裝。
- 已增設連接加固第二週已加裝連接件,加強部分結構與牆面的連接。
進行中 和· Gabriel 協助切板/預鑽孔,具體分配由榮強安排;Ken Fong(嘉輝)協助榮強安裝。Judy 和 Janet 現場支援,Judy 帶一道菜。Du Jiakun(杜弟兄)已確認 週一重點
- 完成與牆面的最後加固George(耀基)10 月
1519 日(週四)切板。邓集已確認週一)繼續完成結構與牆面的加固。 - 完成外側木板安裝接續已開始的工作,目標是完成已刷好外側木板的安裝。
接下來要完成
- 玻璃窗及門安裝房間玻璃窗和門。
- 通往門廳的新門洞開出計劃中通往門廳的新門口。
- 隔音材料封牆前放置隔音材料。
- 石膏板及油漆安裝石膏板、處理接縫及表面,再上漆。
- 燈具及開關完成照明及開關安裝。
- 通風設備安裝通風設備,協調電源、氣流及風管路線。
- 電視及小音箱為家長及小組使用,安裝電視和小音箱。
- 影音網絡及佈線完成影音、網絡連接及相關佈線。
封牆前先協調:電線、影音網絡及通風路線,再安排隔音材料及石膏板。具體工序由榮強與相關有經驗的幫手確認。以上是項目尚餘工作,不代表承諾在第三週全部完成。
不需要是專業建造人員,也不需要自備工具或曾參與設計。請説明自己的經驗,方便安排合適的工作。
玻璃、電工、通風及結構工作需要合適且有經驗的幫手。報名一般施工崗位,不等於可以承擔這些工作。由榮強確認安全分工,開門安排另行確認。
按需要合計約 14 日(週三)及 15 日(週四)協助預鑽孔或安裝,每天由榮強安排具體崗位,每晚計 1 位施工幫手。Adam 和 Gabriel 也已確認 10 月 14 日(週三)切板/預鑽孔,與邓集合計 2–3 位施工幫手,人手已齊,具體分工由榮強安排。Enoch Zheng(鄭以諾)已確認 10 月 15 日(週四)協助安裝,與 Du Jiakun 和邓集合計 3 位施工幫手,人手已齊;合適工作及具體分工由榮強安排。10 月 16 日(週五)實際參與:榮強帶隊安裝外側木板;George(耀基)和 Adam 配搭加固。Jacob(曲華)、Sarah(小濱)、Luke 和 Ken Fong(嘉輝)也到場幫忙。Ericson 協助修好保安系統。Peggy 清潔現場,添平和 Ally 清掃及收集前門落葉。簡牧師下午較早到教會,為施工團隊做飯;Yi Kiu(二嬌)帶來餡餅。大家一起收拾清潔,場地已為週六粵語崇拜及五餅二魚預備好。只確認所列日期。位,崗位可兼任。歡迎輕量支援,不搬重物。
新增已確認支援及開門安排:Catherine(牛慧)於 10 月 15 日(週四)送餐及現場支援,到場時間待確認。Susan(曉英)於 10 月 14 日(週三)現場支援,包括搬運材料及清潔;到場時間待確認。Ericson 於 10 月 15 日(週四)上午 10:00 到教會,為 Sean 開門布線。週四白天的安排與晚上施工分開;支援及開門不計入施工幫手崗位。此處不新增週末施工;如需做工,須另行確認並協調教會活動。
我們需要什麼樣的幫手每次開工前
按崗位配搭施工:按榮強量好的尺寸切板、預鑽孔、協助固定/安裝。榮強量尺寸、指揮、作決定,並在需要時親自固定提高效率;崗位可隨工作調整。逐日確認出席、開始及結束時間,以及開門鎖門安排。實際支援另計:搬運合適的材料、整理、清潔及鼓勵團隊,不計入 3 個施工崗位。由榮強確認合適的工作、工具及當天工序;封牆前協調相關專門工作。- 確認後才安排餐食及實際支援;輕量支援人員不搬重物。
注意現場安全:按榮強指示,在自己能力範圍內做工;他可指導和培訓合適的幫手,切板須由他安排。地板保護繼續保留,除非另有商定;配合教會活動確認清潔時段。自願參與、輪替休息:即使當晚人手已齊,願意參與仍然歡迎,具體工作由榮強安排。請告訴我們實際方便的日期和時間,不需要每晚都來。
時間安排
日期:10 月 13 日至 16 日(週二至週五)。週二晚上 5:30 開始;結束時間和其餘晚上的時間待確認。請以最新排班為準,不自動沿用上週時段。休息:10 月 11、12 日不施工;10 月 18 日(主日)休息。週五清潔:10 月 16 日大家一起收拾清潔,場地已為週六粵語崇拜及五餅二魚預備好。地板保護繼續保留,除非另有商定。週六:尚未安排施工,如需做工須另行協調教會活動。
週五原定安排(計劃)
Jacob(曲華)和 Sarah(小濱)原定共同協助切板/預鑽孔,約晚上 6:00 到場,具體分配由榮強安排。Adam、Ken Fong(嘉輝)及 George(耀基)也已確認協助施工,具體分工由榮強安排。Peggy 原定協助清潔,到場時間待確認;Sinnie 原定晚上 8:30 後協助輕量清潔,不搬重物。
年輕人寫經文的機會
榮強原則上同意在內側框架封板前,用記號筆在獲准的位置寫經文,並拍照留念。時間和位置須與榮強協調。年輕人須有人帶領,在與危險施工分開的安全區域進行;活動時間尚未安排。
你不需要具備的
不需要是專業建築或木工師傅。不需要自備工具。不需要曾參與設計或意見收集。
如何報名
請從最新排班選擇空缺崗位,聯繫添平並説明日期、崗位和方便的時間,例如“週四——預鑽孔”。施工崗位包括切板、預鑽孔及安裝;支援崗位包括材料搬運/現場整理及清潔,特別是週五為週六活動預備的清潔。請説明使用工具的經驗或搬運限制,由榮強確認合適分工並指導。逐日出席及開門安排分開確認;已確認分工以最新排班為準。
背景資料
關於這兩間房間是什麼、為什麼要建、以及會眾提出了哪些需要,請參閱主堂房間:我們要建什麼,需要你回應什麼。